Partners

Autonomy arrives through the people the plant already trusts.

Equipment OEMs for blending, granulation, compression and coating, PAT and NIR vendors, pharma MES vendors, and integrators and validation consultancies. The distribution moat Pildeon is building is a channel where the press, the coater and the probe ship Pildeon-ready.

4 kinds of partnerPre-launch programmeValidation shared

run_b2c7e1 · agent graph · scenario 10 nodes · 1 QA approval gate
01 · orchestrator ingest.batch_record ✓ SUCCEEDED 02 · orchestrator twin.rehearse ✓ SUCCEEDED 03 · blend_dispense blend.uniformity ✓ SUCCEEDED 04 · granulate_dry granulate.dry ✓ SUCCEEDED 05 · compress_fill compress.press ✓ SUCCEEDED 06 · coat_dry coat.spray ✓ SUCCEEDED 07 · defect_inspect inspect.tablets ✓ SUCCEEDED 08 · quality_potency spectra.release_evidence ✓ SUCCEEDED 09 · orchestrator approve.qa ◆ APPROVAL 10 · quality_conf release.genealogy ✓ SUCCEEDED

Scenario: Run one immediate-release tablet batch through granulation, compression, coating and inspection inside the approved design space, with QA approval before release. A design walkthrough, not a customer record.

Programme

Four kinds of partner

Each brings something the plant already relies on.

Equipment OEM

Presses, coaters, granulators, blenders

Ship Pildeon-ready connectors and validated autonomy on the machine. The OEM's design space becomes the agent's wall.

PAT and NIR vendor

Probes and analysers

Spectra become release evidence. The vendor's method validation is what Spectryn's evidence chain cites.

MES and QMS vendor

Systems of record

Genealogy and release packages written back into the system QA already uses. No parallel record.

Integrator and validation consultancy

Deployment and CSV

Deploy the edge node, map tags, run shadow mode and own the site validation package alongside the plant.

Commercial

How the partnership works

Simple, and written down.

Partners get

  • Early access to the SDK, connectors and the twin harness
  • Joint design-partner engagements and shared validation artefacts
  • Referral and resale terms agreed per partner type
  • A named engineering contact and a shared release line

Partners commit to

  • Read-path documentation for their equipment or system
  • Respecting the autonomy model: no write path without site QA
  • Honest status: no shipped-feature claims for planned work
  • Tenant isolation of plant data they help connect
Run timeline · scenario

What a partner-delivered run looks like

The press connector from the OEM, the spectra from the PAT vendor, the genealogy into the MES, the validation package from the integrator. Same run, four partners.

run_b2c7e1 Line 2 · rotary tablet press · scenario SUCCEEDED
  1. 01 ingest.batch_record SUCCEEDED 1.2 s

    Plant Orchestrator · Pulled the master batch record, the approved design-space limits for this formulation and tooling family, and the site autonomy policy from MES; locked the target envelope for the run.

  2. 02 twin.rehearse SUCCEEDED 41 s

    Plant Orchestrator · Twindra simulated 36 candidate setpoint vectors on the as-made batch twin (granulation DEM, compression and ejection risk, coating CFD, dissolution surrogate) and ranked them on predicted content uniformity, capping risk and takt.

  3. 03 blend.uniformity SUCCEEDED 6 m 10 s

    Blend-and-Dispense · Spectryn scored in-line NIR spectra against the formulation's chemometric model; the blend reached its uniformity end point with confidence bounds inside the site acceptance limit and blending stopped on evidence rather than on a fixed time.

  4. 04 granulate.dry SUCCEEDED 3 m 48 s

    Granulate-and-Dry · Inlet air temperature and drying airflow trimmed inside the approved window to bring loss-on-drying to the target moisture band for compression; the move was bounded, logged and inside the design space.

  5. 05 compress.press SUCCEEDED 2 m 02 s

    Compress-and-Fill · Main compression force and feed-frame speed adjusted inside the approved window to hold tablet weight and hardness on target while the twin's capping-risk estimate stayed under the site threshold.

  6. 06 coat.spray SUCCEEDED 4 m 25 s

    Coat-and-Dry · Spray rate and inlet temperature re-phased against bed temperature and exhaust humidity to hold the film-coat window and avoid twinning and mottling; no excursion from the validated recipe envelope.

  7. 07 inspect.tablets SUCCEEDED continuous

    Defect-and-Inspect · Visqa classified chips, cracks, capping, spots, mottling and print defects on six synchronised cameras, within the sub-100 ms design budget, and linked a rising chip rate to coating spray rather than to tooling.

  8. 08 spectra.release_evidence SUCCEEDED 38 s

    Quality-and-Potency · Spectryn assembled the method-linked evidence chain for content uniformity and moisture with confidence bounds and citations to the validated analytical method, ready for QA review.

  9. 09 approve.qa APPROVAL 3 m 14 s

    Plant Orchestrator · Batch release is above every autonomy level Pildeon offers. The package was held for the named QA reviewer, who approved it in the review console; the decision, the reviewer identity and the timestamp are in the Part 11 audit trail.

  10. 10 release.genealogy SUCCEEDED 52 s

    Quality-and-Conformance · Conforma wrote the time-aligned batch genealogy (every sensor state, recommendation, approved action, equipment response and QC result) and the cited release package to the immutable audit trail.

Onboarding

Becoming a certified partner

Three steps.

  1. Technical. Read-path connector built and validated against the partner's system in the twin harness.
  2. Joint engagement. One design-partner plant delivered together, shadow to assist.
  3. Certification. Write-path connector validated with site QA; partner listed on the integrations page.
Accelerated computing

Physical AI, at the press

Tablets leave a rotary press by the hundreds of thousands an hour. Perception has to be local, deterministic and fast, so Pildeon runs GPU inference on the plant edge and keeps training, simulation and optimisation on DGX, HGX or OVX, on-prem where the data cannot leave the plant.

Jetson Orin / Thor · DeepStream · Holoscan · TensorRT

Edge perception

Multi-camera chip, crack, spot and print inspection and NIR and PAT fusion on the plant edge. Design targets: under 100 ms per camera frame group, under 500 ms for a fused risk score.

Triton · NIM · NeMo Guardrails

Validated model serving

Vision, spectral, time-series and process-reasoning models behind one orchestrator, versioned, tenant-isolated, with bounded actions and audit schemas enforced at the serving layer.

DGX / HGX · CUDA · RAPIDS · NeMo

Training and fine-tuning

Defect vision, coating appearance, NIR and PAT chemometrics, press and coater time-series models and process-window models, trained under GxP change control.

Omniverse · OVX · Warp · Modulus

As-made batch twin

GPU-accelerated DEM granulation, CFD coating spray and drying, compression and ejection risk and a dissolution surrogate. Design target: nightly design-space sweeps per formulation family.

Omniverse Replicator · Cosmos

Synthetic rare faults

Capping, lamination, sticking, mottling, segregation and print-defect scenarios generated for class balance, always labelled synthetic and evaluated apart from real GMP evidence.

cuOpt · Isaac

Optimisation and handling

Campaign and changeover sequencing, drying and coating energy allocation and line balancing with cuOpt; sim-first IBC and tooling handling policies trained and rehearsed with Isaac.

Fit

Who this works for

And who it does not.

Good fit

Vendors with an OPC UA or API read path

If your equipment or system exposes its telemetry, the connector is weeks, not quarters.

Good fit

Consultancies that own CSV

If you already write validation packages for OSD plants, you are the natural owner of the Pildeon site package.

Not yet

Resellers without engineering

Pildeon is deployed, validated and supervised. A partner has to be able to do at least one of those.

Integrations

It speaks tablet plant, not cloud

Pildeon reads and writes through the systems already on the floor: presses, coaters, granulators, PAT probes, MES, LIMS and historians. No rip-and-replace, no parallel historian. Connectors are built with design partners against their stacks; the vendors listed are the ones common in OSD plants.

Blending and granulation

GEA, Glatt, Syntegon, Freund-Vector, L.B. Bohle

Blender, granulator and fluid-bed telemetry; bounded setpoint writes

Tablet presses and fillers

Fette Compacting, Korsch, IMA, Syntegon, MG2

Force curves, fill depth, ejection force; bounded setpoint writes

Coating systems

GEA, Glatt, O'Hara, Thomas, Freund

Spray, inlet, bed temperature, exhaust humidity; bounded writes

PAT and NIR

Bruker, Sartorius, Viavi probes and analysers

Spectra across blend, granulation, drying and compression

Vision

Line cameras and existing inspection systems

Frames, defect maps, reviewed images

Pharma MES and eBR

Körber Werum PAS-X, Rockwell, Siemens Opcenter

Master batch records, campaigns, batch genealogy

LIMS and historians

Site LIMS, OSIsoft PI and equivalent historians

QC results, time-series backfill and replay

Identity and edge

Azure AD, Okta, LDAP · NVIDIA Jetson and on-prem GPU

SSO, RBAC, named approvers · inference at the line

See all integrations

Guardrails

An agent that can move a compression force needs a leash

Pildeon writes to production equipment in a GMP plant. Every capability is scoped to the approved design space, every write is policy-checked, every action is written to an immutable Part 11 audit trail the site owns, and no agent can release a batch.

  • Bounded action space. Each agent can only write to an explicit setpoint allow-list, inside the limits the site's validation approved.
  • Policy engine before every write. Autonomy level, design-space limits, batch state, model version and reviewer assignment are all evaluated before a setpoint moves.
  • Human-in-the-loop gates. Batch release, any move outside the design space and any change to a validated parameter wait for a named QA reviewer.
  • Immutable audit trail. Append-only, hash-chained, exportable, retained on the site's own storage, with reviewer identity and timestamp on every decision.
  • Hard fallback. Loss of the edge node, the network or the model returns the line to the equipment's last known-good recipe.
  • Tenant and IP isolation. Formulations, recipes and models never cross a customer boundary. Validated on-prem deployment is available for regulated producers.

Compliance posture

Compliance and validation status
StandardScopeStatus
21 CFR Part 11Audit trail, e-signatures, records RUNNING Designed in from day one
GAMP 5Validation package for the platform RUNNING In progress, planned for the first design partners
cGMP · ICH Q8 to Q13Design space, QbD, continuous manufacturing RUNNING Design-aligned; site validation decides
SOC 2 Type ICloud control plane QUEUED Planned, first six months
SOC 2 Type IICloud control plane QUEUED Planned, months six to twelve
Data residencyValidated on-prem, air-gapped option SUCCEEDED Available by design

Read the security and validation overview

The first meeting

What each stakeholder asks first

Pildeon has no customer quotes to show yet, and will not invent any. These are the questions the three buyers in an OSD plant ask in the first meeting, and the answer each gets.

"What does this do to my reject rate, my deviation count and my release time, and how will you prove it on my line rather than on a slide?"

Site or manufacturing director · economic buyer

Answer: shadow mode first, baseline captured before any autonomous action, a written ROI target before a paid pilot.

"Will it ever move a setpoint outside the design space we validated, and can I see why it recommended every move it made?"

Formulation or process engineer (MSAT) · champion

Answer: no, by construction. Every recommendation carries its reasoning trace and its citation.

"Where is the Part 11 audit trail, who signs the release, and what happens to my validated state when the model changes?"

QA, quality and compliance lead · approver

Answer: an immutable audit spine, a named QA reviewer on every release, and every model change under GxP change control.

Enterprise

Standardise validated autonomy across the group

One policy model, one audit spine, one benchmark across every line in every plant, with formulation and tooling models kept private to each site.

Talk to the team Enterprise details

  • SSO, RBAC and named approvers down to the setpoint level
  • Group autonomy policy with per-site override and approval chains
  • Cross-plant benchmarking on yield, rejects, deviations and energy
  • Validated on-prem and air-gapped plant-edge deployment options
  • Validation packages and change-control records as first-class deliverables
  • Dedicated deployment engineer and quarterly model review per site
FAQ

Straight answers

The questions site directors, MSAT engineers and QA leads actually ask in the first meeting.

Yes, but only inside an explicit setpoint allow-list bounded by the design space your validation approved, and only at the autonomy level your site has set. Level 0 is shadow mode: Pildeon observes and predicts and writes nothing. Most sites spend their first weeks there.

Get started

Bring autonomy to the plants you already serve

Tell us what you make or integrate. We will tell you where it plugs in.